Automated Cat 1 Load Test Reminders
Every Monday, WebRun opens FIELDBOSS, reads each elevator's last Category 1 annual no-load test date, works out which units come due in the next sixty days, logs them to a Google Sheet, and sends your compliance lead a Telegram reminder ranked by how soon each is due.
How do I track annual Category 1 elevator load tests?
Every Monday, WebRun reads each elevator's last Category 1 annual test date in FIELDBOSS, works out which units come due within 60 days, and logs them to a Google Sheet sorted soonest-first. It sends your compliance lead a Telegram reminder with anything inside 14 days at the top, so no annual load test is ever missed.
- No annual Cat 1 test slips past its due date
- Compliance sees the whole year's testing load in one sheet
- Tests due within two weeks are surfaced first every Monday
Built for elevator service contractors · compliance leads · inspection coordinators · field-service teams
What does WebRun do on every run?
The exact actions WebRun takes, in order - in plain language, so you can adjust anything.
-
WebRun signs in and gets to work
Opens
www.fieldboss.comin a real browser with your saved login - no setup, no API keys. -
1
FIELDBOSS - find Cat 1 tests coming due
WebRun opens FIELDBOSS to find annual Cat 1 tests coming due. - Open FIELDBOSS and read each unit's last Category 1 annual test date
- Work out which elevators are due for a Cat 1 test in the next 60 days
- Note the site, unit, jurisdiction, and the assigned inspector or agency
Done when Every unit due for a Cat 1 test in the next 60 days is listed with its date and jurisdiction.
-
2
Google Sheets - log the due tests
WebRun logs the coming-due Cat 1 tests to a Google Sheet. - Append a row per unit: site, last test, due date, and days remaining
- Sort so the soonest-due tests sit at the top
- Keep a rolling tab so you can see the year's testing load at a glance
Done when Every coming-due Cat 1 test is logged and sorted by due date.
-
3
Telegram - remind the compliance lead
WebRun sends the compliance lead a Cat 1 reminder in Telegram. - Send the compliance lead a short list of units due in the next 60 days
- Put anything due inside 14 days at the top with the jurisdiction noted
- Link the sheet for the full testing calendar
Done when The compliance lead has this week's ranked Cat 1 reminder in Telegram.
How is each run configured?
Secure by default
Connect once, stays signed in
WebRun signs in once and keeps each session in a persistent environment, so every run picks up right where it left off.
Every action is checked against this policy before it runs.
Questions, answered
Does it schedule the test or contact the inspector?
No. WebRun only produces an internal reminder and a logged sheet for your compliance lead. It never books an inspector or emails a jurisdiction on its own. A person decides how and when each test is scheduled.
How far ahead does it warn me?
It flags any unit whose Cat 1 test is due within 60 days and pushes anything inside 14 days to the top of the Telegram reminder, so nothing sneaks up on you.
Where does it get the last test date?
It reads each elevator's recorded Category 1 test history in FIELDBOSS, so the due date is calculated from your live records, not a separate spreadsheet you have to maintain.