All templates

FactoryLogix Automatic Test Yield Reports

Every night, WebRun opens FactoryLogix, pulls test results from every line and test station that ran that day, calculates first pass yield and the top failure codes, logs the trend to a Google Sheet, and texts the quality engineer through Twilio the moment any station falls below the yield floor you set.

Runs on WebRun · Strict Lockdown policy
Every day at 9:00 PM WebRunorchestrates each step
1 FactoryLogix pull test results for every line and station
2 Google Sheets log first pass yield and top failure codes
3 Twilio text the quality engineer on a yield drop
In short

How do I track first pass test yield and get alerted when it drops?

WebRun pulls test results from FactoryLogix every night for every line and station, calculates first pass yield and ranks the top failure codes, logs the trend to a Google Sheet, and texts the quality engineer through Twilio the moment any station falls below the yield floor you set, so a slipping line gets caught the same night it happens.

  • First pass yield is logged for every station every night without a manual pull
  • A dropping station gets a same night text instead of surfacing at the weekly review
  • Failure codes are ranked so the quality team knows where to start looking

Built for contract electronics manufacturers · quality engineers · test engineering teams · EMS plant managers

Step by step

What does WebRun do on every run?

The exact actions WebRun takes, in order - in plain language, so you can adjust anything.

  1. WebRun signs in and gets to work

    Opens www.aiscorp.com/solutions/manufacturing-intelligence in a real browser with your saved login - no setup, no API keys.

  2. 1
    FactoryLogix - pull test results for every line and station
    aiscorp.com
    WebRun in FactoryLogix: pull test results for every line and station
    WebRun opens FactoryLogix to pull test results for every line and station.
    • Open FactoryLogix Manufacturing Process Execution and pull test results from every test station that ran today, including AOI, ICT, and functional test
    • Calculate first pass yield per station: units passing on the first attempt over total units tested
    • Rank the failure codes recorded at each station from most to least frequent

    Done when Every station that ran today has a calculated first pass yield and a ranked failure code list.

  3. 2
    Google Sheets - log first pass yield and top failure codes
    google.com
    WebRun in Google Sheets: log first pass yield and top failure codes
    WebRun opens Google Sheets to log first pass yield and top failure codes.
    • Open the yield trend log and add one row per station per day with first pass yield and the top 3 failure codes
    • Update the rolling 30 day average yield for each station
    • Highlight any station below your yield floor for today

    Done when Today's yield and failure codes are logged for every station, with the rolling average updated.

  4. 3
    Twilio - text the quality engineer on a yield drop
    twilio.com
    WebRun in Twilio: text the quality engineer on a yield drop
    WebRun opens Twilio to text the quality engineer on a yield drop.
    • If every station is at or above the yield floor, do not send a text. The Google Sheet log is enough
    • If any station falls below the yield floor, text the quality engineer naming the station, the yield, and the top failure code
    • Send at most one text per station per day even if it stays low

    Done when The quality engineer has been texted about any station below the yield floor, and only once per station.

Run settings

How is each run configured?

Starting pageWhere Chrome opens at the start of each run
www.aiscorp.com/solutions/manufacturing-intelligence
ScheduleRuns automatically on this cadence
Every day at 9:00 PM
DeliveryHow each run's result reaches you
Yield report · Google Sheets
OutputWhat each run produces - A nightly first pass yield and top failure codes per station logged to Google Sheets, with a same night text if any station drops below your yield floor.
Text
Setup & safety

Secure by default

Connect once, stays signed in

WebRun signs in once and keeps each session in a persistent environment, so every run picks up right where it left off.

Your credentials stay in your own private environment - WebRun never stores your passwords.
Strict Lockdown

Every action is checked against this policy before it runs.

Domains ALLOWLIST
Typed input ALLOW
Shell command BLOCK
File uploads BLOCK
Runs in a contained environment More on policies
Good to know

Questions, answered

What counts as a first pass yield failure?

Any unit that fails its first test attempt at a station, whether it later passes on retest or repair. WebRun reads this directly from the test results already recorded in FactoryLogix.

Who gets texted when yield drops?

Only the quality engineer you assign, and only when a station falls below the yield floor you set. Stations performing normally never generate a text, just a logged row.

Does it tell me why yield dropped?

It ranks the failure codes recorded at that station so you can see the most frequent defect first. Root cause investigation still needs a person, WebRun points you at where to start.

Put this on autopilot.

Turn it on in minutes - or have our team set it up for you.