Give line leads a heads up before every SMT changeover
Every 15 minutes during production hours, WebRun checks the FactoryLogix line schedule for changeovers coming up in the next 30 minutes, texts the line lead through Twilio which job is ending and which is loading next, and posts the full day's changeover sequence to your production Telegram group.
- No credit card
- Under $0.01 per run
- Cancel anytime
How do I give line leads advance notice before an SMT changeover?
WebRun checks the FactoryLogix line schedule every few minutes for changeovers due in the next 30 minutes, texts the line lead through Twilio which job is ending and which is loading next, and posts the full day's changeover sequence to your production Telegram group, so no line loses time waiting on a setup nobody saw coming.
- Line leads get a 30 minute heads up instead of finding out at the machine
- The floor sees the full day's changeover sequence in one place
- A resequenced line updates its notice automatically instead of going stale
Built for contract electronics manufacturers · SMT line leads · production supervisors · EMS shift schedulers
What does WebRun do on every run?
The exact actions WebRun takes, in order - in plain language, so you can adjust anything.
-
WebRun signs in and gets to work
Opens
www.aiscorp.com/solutions/manufacturing-process-executionin a real browser with your saved login - no setup, no API keys. -
1
FactoryLogix - check the line schedule for upcoming changeovers
WebRun opens FactoryLogix to check the line schedule for upcoming changeovers. - Open FactoryLogix Manufacturing Process Execution and check the run schedule for every SMT line
- Find any changeover scheduled to start in the next 30 minutes
- Note the job ending, the job loading next, and the program and feeder setup it needs
Done when Every changeover due in the next 30 minutes is identified with the outgoing and incoming job.
-
2
Twilio - text the line lead ahead of each changeover
WebRun opens Twilio to text the line lead ahead of each changeover. - For each upcoming changeover, text the assigned line lead the outgoing job, the incoming job, and the setup it needs
- Send the text once, 30 minutes ahead of the changeover, not repeated as it gets closer
- Keep the text short enough to read in a glance on the floor
Done when The line lead for every upcoming changeover has been texted 30 minutes ahead.
-
3
Telegram - post the day's full changeover sequence
WebRun opens Telegram to post the day's full changeover sequence. - Post the production group the full changeover sequence for the day at shift start
- List each changeover in run order with its scheduled time and the line it affects
- Update the posted sequence if FactoryLogix shows the schedule has changed
Done when The floor has the day's full changeover sequence posted in Telegram and kept current.
How is each run configured?
Secure by default
Connect once, stays signed in
WebRun signs in once and keeps each session in a persistent environment, so every run picks up right where it left off.
Every action is checked against this policy before it runs.
Questions, answered
How far ahead does the line lead get notified?
30 minutes before the changeover is scheduled to start, based on the run schedule already set in FactoryLogix. That is enough time to stage the next program and feeder setup without rushing.
Does it change the run sequence?
No. WebRun only reads the schedule already set in FactoryLogix and notifies the line lead. Resequencing a line still happens as a person, inside FactoryLogix.
What if the schedule changes during the shift?
It rechecks FactoryLogix every few minutes, so a resequenced changeover updates the Telegram sequence and still gets its own 30 minute text to the line lead.