All templates

Automated Code Violation Deadline Alerts

Every morning, WebRun opens FIELDBOSS, reads open code violations from inspection reports, works out which have a correction deadline in the next thirty days or already past, logs them to a Google Sheet, and posts your compliance team a Slack alert ranked by how close each deadline is.

Runs on WebRun · Strict Lockdown policy
Every day at 7:00 AM WebRunorchestrates each step
1 FIELDBOSS read open violations
2 Google Sheets log correction deadlines
3 Slack alert the compliance team
In short

How do I track elevator code violation correction deadlines?

Every morning, WebRun reads open code violations from inspection reports in FIELDBOSS, finds those with a correction deadline within 30 days or overdue, and logs them to a Google Sheet. It posts your compliance team a Slack alert with overdue items first, so every violation is corrected before a penalty or a failed re-inspection.

  • No correction deadline slips into a penalty
  • Overdue violations surface at the top every morning
  • Scheduled corrections drop off so the list stays actionable

Built for elevator service contractors · compliance teams · inspection coordinators · field-service teams

Step by step

What does WebRun do on every run?

The exact actions WebRun takes, in order - in plain language, so you can adjust anything.

  1. WebRun signs in and gets to work

    Opens www.fieldboss.com in a real browser with your saved login - no setup, no API keys.

  2. 1
    FIELDBOSS - read open violations
    fieldboss.com
    WebRun in FIELDBOSS: read open violations
    WebRun opens FIELDBOSS to read open code violations.
    • Open FIELDBOSS and read open violations logged from inspection reports
    • Work out which have a correction deadline within 30 days or already overdue
    • Note the unit, cited code, required correction, and the assigned technician

    Done when Every open violation with a near or past deadline is listed with its cited code.

  3. 2
    Google Sheets - log correction deadlines
    google.com
    WebRun in Google Sheets: log correction deadlines
    WebRun logs violation correction deadlines to a Google Sheet.
    • Append a row per violation: unit, cited code, correction, and deadline
    • Sort so overdue and soonest-due items sit at the top
    • Mark which corrections are already scheduled so they are not chased twice

    Done when Every near or overdue violation is logged and sorted by deadline.

  4. 3
    Slack - alert the compliance team
    slack.com
    WebRun in Slack: alert the compliance team
    WebRun posts the compliance team a violation alert in Slack.
    • Post the compliance team a ranked alert of violations coming due or overdue
    • Put anything already past its deadline at the very top
    • Link the sheet so a correction visit can be assigned

    Done when The compliance team has today's ranked violation alert in Slack.

Run settings

How is each run configured?

Starting pageWhere Chrome opens at the start of each run
www.fieldboss.com
ScheduleRuns automatically on this cadence
Every day at 7:00 AM
DeliveryHow each run's result reaches you
Violation worklist · Slack
OutputWhat each run produces - A ranked worklist of open code violations with correction deadlines within 30 days or overdue, logged to a sheet and posted to Slack, overdue first.
Text
Setup & safety

Secure by default

Connect once, stays signed in

WebRun signs in once and keeps each session in a persistent environment, so every run picks up right where it left off.

Your credentials stay in your own private environment - WebRun never stores your passwords.
Strict Lockdown

Every action is checked against this policy before it runs.

Domains ALLOWLIST
Typed input ALLOW
Shell command BLOCK
File uploads BLOCK
Runs in a contained environment More on policies
Good to know

Questions, answered

Does it respond to the jurisdiction for me?

No. WebRun produces an internal worklist and a logged sheet only. It never files a correction notice or contacts an inspector on its own. Your compliance team assigns and closes each correction, using the list so none is late.

How does it know a correction is due?

It reads open violations recorded from inspection reports in FIELDBOSS and their correction deadlines, flagging anything due within 30 days or already overdue so the team can act before penalties or a re-inspection failure.

Will it keep flagging a violation that is already scheduled?

No. It marks corrections that already have a visit scheduled so they drop off the active worklist, keeping the Slack alert focused on what still needs to be assigned.

Put this on autopilot.

Turn it on in minutes - or have our team set it up for you.