Tekla PowerFab Automatic RFI Response Tracking
Every morning, WebRun opens Procore, pulls every RFI your team has submitted that is still open, matches each one to the piece marks and drawings on hold in Tekla PowerFab, and posts a Microsoft Teams alert for any RFI that has gone past its expected response time and is holding up fabrication.
How do I track which open RFIs are actually holding up my fabrication schedule?
WebRun pulls every open RFI your team submitted in Procore each morning, matches each one to the piece marks and drawings it's holding in Tekla PowerFab, and posts a ranked Teams alert for any RFI overdue for a response. Your PM sees exactly which unanswered questions are actually stalling fabrication, instead of scrolling the full RFI log.
- Overdue RFIs are ranked by how many piece marks they're actually holding
- PMs stop manually cross checking the RFI log against the fabrication schedule
- Every open RFI is visible with its real impact on the shop, not just its age
Built for structural steel fabricators · steel detailers · fabrication shop PMs · project engineers
What does WebRun do on every run?
The exact actions WebRun takes, in order - in plain language, so you can adjust anything.
-
WebRun signs in and gets to work
Opens
login.procore.comin a real browser with your saved login - no setup, no API keys. -
1
Procore - pull open RFIs your team submitted
WebRun opens Procore to pull open RFIs your team submitted. - Open Procore and pull every RFI your team submitted that is still open
- Capture the RFI number, the question, the date submitted, and the expected response date
- Flag any RFI past its expected response date as overdue
Done when Every open RFI is listed with its submitted date and whether it is overdue.
-
2
Tekla PowerFab - match each RFI to the piece marks on hold
WebRun opens Tekla PowerFab to match each RFI to the piece marks on hold. - Match each open RFI to the job, drawing, and piece marks it affects in Tekla PowerFab
- Flag any piece mark on hold pending the RFI answer
Done when Every open RFI is tied to the piece marks it is holding, if any.
-
3
Microsoft Teams - alert on RFIs overdue for a response
WebRun opens Microsoft Teams to alert on RFIs overdue for a response. - Post an alert listing every overdue RFI with the piece marks it is holding from fabrication
- Sort the list with RFIs holding the most piece marks or the oldest at the top
- Tag the detailer or PM responsible for following up with the GC or EOR
Done when Your PM has today's ranked list of overdue RFIs and what they're blocking, in Teams.
How is each run configured?
Secure by default
Connect once, stays signed in
WebRun signs in once and keeps each session in a persistent environment, so every run picks up right where it left off.
Every action is checked against this policy before it runs.
Questions, answered
Will it follow up with the GC or engineer of record on its own?
No. WebRun only flags overdue RFIs internally in Teams. Any follow up with the GC or EOR is a call or email your PM sends themselves.
How does it know an RFI is overdue?
It compares each RFI's submitted date against its expected response date in Procore, so anything past that date is flagged the next morning.
Does it track RFIs that don't affect fabrication?
It reads every open RFI from Procore, but it only shows piece marks on hold for RFIs it can match to a job and drawing in Tekla PowerFab.
Put this on autopilot.
Turn it on in minutes - or have our team set it up for you.