All templates

Tekla PowerFab Automatic Erection Crew Schedules

Every Monday, WebRun opens Tekla PowerFab, checks which piece marks are fabricated and scheduled to ship this week, blocks the erection crew's dates on Google Calendar, and drafts a schedule notice to the site superintendent in Gmail, holding it unsent so your PM can review it before it goes out.

Runs on WebRun · Strict Lockdown policy
Every Monday at 7:00 AM WebRunorchestrates each step
1 Tekla PowerFab check which piece marks ship this week
2 Google Calendar block the erection crew's dates
3 Gmail draft the schedule notice to the site
In short

How do I turn this week's steel shipping schedule into a booked erection crew calendar?

WebRun checks Tekla PowerFab's shipping schedule every Monday, finds which piece marks are set to ship and erect that week, and books the crew's dates on Google Calendar. It also drafts a schedule notice to the site superintendent in Gmail and leaves it unsent, so your project manager can review the dates before anything goes to the job site.

  • The erection crew's calendar is booked before the week starts, not the morning of
  • Slipped loads get caught and re-scheduled automatically each Monday
  • Nothing reaches the site superintendent until your PM reviews and sends it

Built for structural steel erectors · fabrication shop PMs · field superintendents · steel dispatch coordinators

Step by step

What does WebRun do on every run?

The exact actions WebRun takes, in order - in plain language, so you can adjust anything.

  1. WebRun signs in and gets to work

    Opens www.tekla.com/products/tekla-powerfab in a real browser with your saved login - no setup, no API keys.

  2. 1
    Tekla PowerFab - check which piece marks ship this week
    tekla.com
    WebRun in Tekla PowerFab: check which piece marks ship this week
    WebRun opens Tekla PowerFab to check which piece marks ship this week.
    • Open Tekla PowerFab and filter the shipping schedule to loads planned for this week
    • Capture the job, the piece marks on each load, and the planned ship date
    • Note any load that slipped from last week's plan

    Done when Every load planned to ship this week is listed with its piece marks and date.

  3. 2
    Google Calendar - block the erection crew's dates
    calendar.google.com
    WebRun in Google Calendar: block the erection crew's dates
    WebRun opens Google Calendar to block the erection crew's dates.
    • Create a calendar hold for the erection crew for each planned ship and erect date
    • Include the job name and piece mark count in the event details
    • Invite the crew lead to each hold

    Done when The erection crew's calendar has a hold for every load planned this week.

  4. 3
    Gmail - draft the schedule notice to the site
    gmail.com
    WebRun in Gmail: draft the schedule notice to the site
    WebRun opens Gmail to draft the schedule notice to the site.
    • Draft a schedule notice to the site superintendent listing the loads and dates
    • Leave the email as a draft in the outbox for your project manager to review
    • Never send the notice on its own, a human always approves it first

    Done when A reviewable draft notice is waiting for your PM for every week with a planned erection load.

Run settings

How is each run configured?

Starting pageWhere Chrome opens at the start of each run
www.tekla.com/products/tekla-powerfab
ScheduleRuns automatically on this cadence
Every Monday at 7:00 AM
DeliveryHow each run's result reaches you
Crew schedule · Google Calendar
OutputWhat each run produces - A booked calendar hold for each planned erection load and a draft site notice waiting for review.
Calendar + drafts
Setup & safety

Secure by default

Connect once, stays signed in

WebRun signs in once and keeps each session in a persistent environment, so every run picks up right where it left off.

Your credentials stay in your own private environment - WebRun never stores your passwords.
Strict Lockdown

Every action is checked against this policy before it runs.

Domains ALLOWLIST
Typed input ALLOW
Shell command BLOCK
File uploads BLOCK
Runs in a contained environment More on policies
Good to know

Questions, answered

Will it email the site superintendent without me seeing it first?

No. The schedule notice is always left as a Gmail draft. WebRun never sends it, your project manager reviews and sends it themselves.

What if a load slips after the calendar hold is made?

The next Monday run reads the live shipping schedule again, so a slipped load gets a new hold and the draft notice reflects the updated date.

Does it book the crew's time off or PTO?

No. It only creates holds for planned erection dates pulled from Tekla PowerFab. It never touches existing personal or time-off events on the calendar.

Put this on autopilot.

Turn it on in minutes - or have our team set it up for you.